United General Construction

Flooring Installation

Most single-room installs are a day or two; whole-home flooring runs several days depending on square footage and material.
How the work goes
Most single-room installs are a day or two; whole-home flooring runs several days depending on square footage and material.
  • Removal and haul-off of old flooring
  • Subfloor inspection, leveling, and repair
  • Material acclimation for our temperature and humidity swings
  • Luxury vinyl plank, laminate, tile, or engineered hardwood install
  • Transitions, thresholds, and trim
  • Baseboard and quarter-round finishing

A floor is only as good as what's under it. In our climate, homes swing from dry winter heat to warm summers, and materials move — so the two things that matter most are subfloor prep and acclimation. We pull the old flooring, inspect the subfloor for soft spots or unevenness, and level it before anything new goes down. Skip that step and you get flex, gaps, and squeaks no matter how nice the product is.

We install luxury vinyl plank, laminate, tile, and engineered hardwood. LVP is the popular choice here for good reason — it's durable, waterproof, and handles the temperature swings without gapping, which makes it a strong fit for kitchens, baths, and basements. For tile, we set it on the right substrate with proper thinset and sealed grout. For hardwood and laminate, we let the material acclimate to the house before install so it doesn't expand or contract after it's down.

Flooring is only as flat as the subfloor under it — the prep nobody sees is what keeps it from gapping.

The finish work is what separates a clean install from an amateur one — tight transitions at doorways, thresholds that sit flush, and baseboard or quarter-round that hides the expansion gap without pinning the floor. We handle all of it and haul the old material away, so you walk back into a finished room, not a project.

Ready to start your flooring installation?

Call Now Free Quote